    Initial Contact & Orientation

    Your journey starts with an initial consultation to discuss your needs and vision. During this meeting:

    . General documentation is provided.

    . An estimate of design costs may be given.

    . If you already own property, we arrange a site visit.

    . If you are still searching for property, we will guide you on costs and the search process.

    Need Financial Advice?

    We provide guidance on purchasing options (private vs. company ownership) and wealth management.

  • Miniature house on architectural plans with magnifying glass and piggy bank.

    Plan it.

    A preliminary budget estimate is prepared, covering design costs, Spanish architect fees, and a timeline. An agreement is signed before proceeding with the concept phase.

    For existing properties:

    Photo Report (Before & After)

    Survey of Existing Conditions

    Topographic Survey (for undeveloped land)

  • Aerial view of a wooden house frame under construction on a dirt lot.

    Design it.

    Concept Design

    A preliminary design is created based on your vision.

    Collaboration with the Spanish architect ensures compliance with local regulations.

    A 3D visualization of the design, including interior and landscaping concepts can be done optional.

    Approval Process

    The concept is presented for review and modifications.

    A maximum number of iterations is included in the design fee.

    Final Design & Permits

    The design is finalized and submitted for permits.

    The project manager is involved in discussions early on.

  • Construction site with heavy machinery including excavators and bulldozers working on earthmoving and land grading.

    Prepare it.

    Permit Applications

    Handled by a Spanish architect or legal advisor.

    Execution Plans

    A Spanish architect creates detailed plans and specifications.

    Contractor Selection

    Selection and contracting of builders and subcontractors.

    The choice between multiple contractors or a general contractor depends on complexity, budget, and timeline.

    Contract Signing

    Final agreements are signed with contractors before construction begins.

  • Worker in red shirt on a ladder painting or constructing a white building exterior under a blue sky with clouds.

    Build it.

    Construction Begins

    Contractors start the work depending on the type of project (reform or newbuilt).

    Our site supervisor oversees progress and reports to our project manager and design team.

    Supervision & Quality Control

    The technical architect ensure work is done to specifications. The supervisor or projectmanager overlooks all the parties.

    Regular inspections are conducted.

    Adjustments & Updates

    Ongoing adjustments may be made with input from our Belgian and Spanish architect.

    Regular updates are provided to clients.

  • Black cutlery in divided compartments

    Finish it.

    Concept & Budgeting

    Interior and landscaping design are developed based on preferences.

    Budgeting and timeline estimation are completed.

    Procurement & Storage

    Materials and furnishings are selected from approved suppliers.

    Storage can be arranged if needed.

    Homestyling and furniture

    During this stage the interior architect will provide plans and moodboards and can arrange the purchase of the furniture and decoration in agreement with the owner.

    Installation & Setup

    Cleaning and staging of the home for the final viewing.

  • Hand holding a keychain with house-shaped charm and keys in front of a door lock.

    Hand it over.

    Structural Handover - Final Inspection

    A final review before handing over the property.

    Aesthetic quality is checked by our Belgian architect.

    Post-Construction Report

    The project leader compiles a report and timeline.

    Any remaining work items are addressed.

    Final Handover

    A photo album is prepared to document the project.

    All necessary property documents are provided.

    The completed home is presented for approval.

    Optional: A marketing photoshoot for social media or magazine publication.

  • White stucco building with green shutters, terracotta steps, aloe vera plants, a potted plant, and a lantern on brick pavement.

    Use it.

    Warranty & Repairs

    Contractors provide warranties for construction elements.

    Ongoing Services

    Maintenance, cleaning, and small repair services are available.

    Coordination for future modifications is possible.

  • Hand holding a small house model

    Rent out or sell it.

    Renting Assistance

    If you decide to rent out your property, we can assist you by putting you in touch with well-known rental agencies and concierges so that you are as much as possible safeguarded from the worries this may entail.

    Selling Assistance

    If you decide to sell, our team can assist with the process since we have a wide network of potential clients and knowledge of the real estate market.